Uday🙂(@uday73860127) 's Twitter Profile Photo

Bullet Train's Thane Depot (one of 3) Received 4 Bids
➡️Dineshchandra-DMRC
➡️KEC International
➡️L&T
➡️ SCC-Premco
Brief Scope: Civil & Building Works, Inspection Sheds, Maintenance Depot, & Installation, Testing & Commissioning of Maintenance Facilities, & other Associated works

Bullet Train's Thane Depot (one of 3) Received 4 Bids
➡️Dineshchandra-DMRC
➡️KEC International
➡️L&T
➡️ SCC-Premco
Brief Scope: Civil & Building Works, Inspection Sheds, Maintenance Depot, & Installation, Testing & Commissioning of Maintenance Facilities, & other Associated works
account_circle
NHSRCL(@nhsrcl) 's Twitter Profile Photo

Sabarmati Multimodal Transport Hub gets power! The 11kV substation installed for Sabarmati Multimodal Transport Hub is successfully charged and is operational.
@infogujarat
Ministry of Railways

Sabarmati Multimodal Transport Hub gets power! The 11kV substation installed for Sabarmati Multimodal Transport Hub is successfully charged and is operational. 
#MAHSR @infogujarat
@RailMinIndia
account_circle
15August.in(@15augustin) 's Twitter Profile Photo

Physical Wor Progress at Pkg C7. Almost all Pillar half casted, only pillar cap left.

The Picture is taken at Maninagar (Ahmedabad) Railway Station. IRCON – DRA JV is working on this pacakge inside City for 18.133 km.

©️One More Train

Physical Wor Progress at #MAHSR Pkg C7. Almost all Pillar half casted, only pillar cap left. 

The Picture is taken at Maninagar (Ahmedabad) Railway Station.  IRCON – DRA JV is working on this pacakge inside #Ahmedabad City for 18.133 km.

©️One More Train
account_circle
15August.in(@15augustin) 's Twitter Profile Photo

MAHSR - Physical Work Progress N/r Vatva Railway Station, Ahmedabad. Span by Span Launcher is reached till here.

©️One More Train

MAHSR - Physical Work Progress N/r Vatva Railway Station, Ahmedabad. Span by Span Launcher is reached till here.

©️One More Train
account_circle
NHSRCL(@nhsrcl) 's Twitter Profile Photo

Impressive update on the project: The construction of the viaduct has made remarkable strides, covering 50 km in the last 7 months.

Impressive update on the #MAHSR project: The construction of the viaduct has made remarkable strides, covering 50 km in the last 7 months. #NHSRCL #BulletTrainIndia
account_circle
Globetrotter 265 🇮🇳(@BhandariDwij) 's Twitter Profile Photo

Jesse Pinkman ManiSudhanshu Atmanirbharta Bhakt We don’t have time. MAHSR can’t wait till VB tech reaches 350.
I am not against having our indigenous trains on our HSR tracks. But they need to reach 350 first on their own accord.

account_circle
15August.in(@15augustin) 's Twitter Profile Photo

Pillar Cap, Pillar casting work on Going in Pkg C7 of MAHSR for 18.133 km lenght. Few Pillars are fully casted with pillar cap.

Span by Span (SBS) Launching technique will be used in entire Ahmedabad City. One more launcher has been arrived from IRCON – DRA JV.

©️One More Train

Pillar Cap, Pillar casting work on Going in Pkg C7 of MAHSR for 18.133 km lenght. Few Pillars are fully casted with pillar cap.

Span by Span (SBS) Launching technique will be used in entire Ahmedabad City. One more launcher has been arrived from IRCON – DRA JV.

©️One More Train
account_circle
Western Railway(@WesternRly) 's Twitter Profile Photo

Revolutionising Rail travel with India's first Project, the Mumbai–Ahmedabad High-Speed Rail corridor (MAHSR), accelerating towards progress.

account_circle
Sahil P(@Sahilinfra2) 's Twitter Profile Photo

.
Mumbai Ahmedabad HSR.
A new era of High speed track construction starts.
The bed is being constructed for Reinforced concrete track bed and reinforced concrete anchor construction.
📷Karthik Mittal

#MAHSR.
Mumbai Ahmedabad HSR. 
A new era of High speed track construction starts. 
The bed is being constructed for Reinforced concrete track bed and reinforced concrete anchor construction.
📷Karthik Mittal
account_circle
Globetrotter 265 🇮🇳(@BhandariDwij) 's Twitter Profile Photo

ManiSudhanshu Atmanirbharta Bhakt Slack time of what sir?
Regarding using 240 kmph SG VB on MAHSR, with all due respect sir running them on MAHSR would increase the travel time by approx 40 min for fast service (4 stops) and approx 1 hr for slow service (12 stops).
That would remove the advantage against ✈️ sir.

account_circle